Friday, June 14, 2013

The Rocket Stove

2013-06-05 16.25.48
Every once in a while I run into a sensational concept that is worth backing, and the rocket stove built by Ahisaun Concrete Products is certainly one of those ideas…
Imagine going home to cook with no electricity and no gas.  What would you do?  Really?  Go out the back and light a BBQ?  Where would your wood come from?  And then where would it come from next week? 
This is a problem for Timorese.  In fact, supplying the cooking needs of 1.1million people in Timor Leste is one of the biggest causes of de-forestation.  Not only that, their stoves are usually just 3 rocks on the ground to support a pot on an open fire.  Extremely inefficient and it can lead to lung cancer for the unfortunate woman who has to bend over it day in and day out to cook for her family.
We’ve tried biogas (and its still worth pursuing) and we also tried woodgas stoves (sorry it didn’t fly Ro).  But rocket stoves are a proven technology that Timorese can handle and actually keep using.
2013-06-07 17.37.21
The cool thing is that there’s a small business right here in Timor Leste that has refined the production of these things using materials sourced in the country.

 
2013-06-05 16.38.34
Preparing clay for casting and firing.
 
On top of that, its a business that provides jobs for people with disabilities.  How cool is that?!

So what’s a rocket stove?
Its basically a way of burning wood in an enclosed, insulated chamber so all the heat is directed straight to the cooking pot.  It burns hotter and cleaner and uses far less wood than traditional methods.  There’s less smoke and less chance of getting burnt while cooking.
The stove itself has 4 main parts:
1. The inner clay chamber:  just the right sort of clay is sourced from the mountains of Timor Leste and mixed in the right proportion with saw dust then cast and fired in an oven (heated by, you guessed it, 2 rocket stoves).  The result is a clay chamber filled with little airpockets (it can float in water) to create an insulative layer.
2013-06-05 16.26.54
Casting the clay, fired inserts in the background
2.  The outer concrete layer:  The inner chamber is then cast into the outer concrete layer to give the whole thing strength and stability as it will have a long working life on a dirt floor kitchen.
3.  Steel spacers:  these are cast into the stove and allow the heat to come up around the pot.
4.  Metal grate:  a special piece that supports the wood so air can enter the chamber from below.
The whole stove including casting, firing, and welding occurs in a small business enterprise called “Ahisaun Concrete Products” Which is part of the Ahisaun Disability Foundation.
2013-06-05 16.28.01
How much does it cost?  One of these babies will set you back $15.  They’re so good we’ve just bought 20 of them. I’m putting this info up here to entertain your inquisitive mind and also to say that if you want, you can chip in for some.  I’ll leave it with you.  We’re pretty excited about it so we’re going to start getting them out into the communities.  (For those folks who already put in for things, this is one place where funds will go.)
2013-06-05 17.12.07
To contact Ahisaun directly about this or find out more:
Sabino Soares 7729 2425     abino_56@yahoo.co.id
http://disabilityetahisaun.wordpress.com
Facebook:  Ahisaun Disability Foundation
2013-06-05 16.43.39
If your in Timor, Ahisaun Concrete Products is just near the Comoro Bridge, 100m to the left of Esset and the Ministry of Agriculture.
We’ve got other cool ideas sprouting up too, like Moringa seedlings to distribute … but that's another story.
Bibles, drums, laptops, sanitary pads, prayers, good vibes and other odds and sods are still coming and going.

Monday, June 3, 2013

One perfect day

IMG_0454 (1000 x 750)
On Saturday, I got up at 5am to head off to Atauro.  The main plan was to check on the progress of the construction of the first cabin for “Emmy’s Place” – a low key tourist accommodation set up. A friend called Dan came with me and we loaded up 6 more drums from MAF (for corn storage) and 2 bags of cement.  I took a bunch of tools ready for a big day’s work.  On the way we had to pass through a pod of dolphins. 

Before getting to the beach we leaped into the water for a bit of a snorkel.  Atekru has some great little crevasses to dive through (with a big lungful of air).  Got to see flashing fish again, and flying fish come standard with the journey.  I was surprised to find that the locals had already started building the cabin with local timbers.  It looks great, and they followed the design well except that they forgot the veranda – oops.  And so ensued a long discussion about how they’d forgotten the veranda, and then some more talk for quite some time about the whole thing and finally after much discussion in their local language they came to the conclusion that they had indeed forgot the veranda. 
IMG_0432
Amongst all this the conversation variously skirted around how the roof line would need to be extended and the possibility that the cabin could be a little short for foreigners and how the flooring would be completed.  But in the end, they had to concede that the veranda was forgotten and that meant we needed two more posts.  Two young fellows were immediately dispatched to bring back some posts.  Occasionally, I’d offer to dig a whole for the posts but got the feeling that I shouldn’t rush into such an ambitious task.  After 1 1/2 hours, two sweaty boys returned with a rather heavy post which had to be trimmed and shaped before being considered worthy for the cabin. 
IMG_0450IMG_0452
I could see that this was not going to be one of those days where I was going to achieve an incredible amount of construction.  But in some way it felt ok, that the main reason for being there was to encourage these happy people.  By this time it was definitely lunch time – a meal including local pumpkin and octopus with morungi leaves and some sort of bean.  (If you haven’t heard of morungi its one of those wonder foods you’ll have to google) 
IMG_0458
After lunch it was decided that we’d find the second post so we set off with the happy Atekruans into the bush and made our way through the rocks at the base of the limestone cliff.  In a gully we had to scale a short but technical little cliff which was a bit slimy.  Dan particularly struggled with this.  In an effort to encourage him, I pointed out a large herIMG_0466mit crab who was also climbing the cliff near his hand, and said, “Look at the crab, just follow what he’s doing!” Unfortunately, at that moment, the crab lost its footing and after bouncing a couple of times down the cliff face, plunged to its doom … oops.  Fortunately, Dan decided not to take my advice and after a nervous moment made it to the top. 

A straight log was duly located and trimmed in the forest.  This is a technical procedure carried out in an attempt to make the log straight by trimming the outside of any curves (I actually like curves).  It took a very long time and Dan and I considered looking for another log as this one looked like it was going to be trimmed down to a pile of wood chips.  Eventually, it too was deemed worthy and we took turns to haul it back down to the beach.  Back at the building site I suggested we might stand up the posts but no, the day was getting on and besides, wouldn’t it be best to let the posts dry out for a few days?  So, that's building in Atekru.  I wouldn’t exactly call it efficient but who would want to be efficient when you can have so much fun being inefficient?
IMG_0460
Dan and I decided that rather than attempting anything else of a practical nature it would be much better to go and have a snorkel and photograph the sunset just so you could see it too.
IMG_0498IMG_0491
We finished the day with some corn and fresh fish – we had to try it boiled and fried to be complete. 
IMG_0461
So I didn’t ‘achieve’ much in terms of building but felt that these island folk had taught me better how to value relationship over achievement.  This day was so good I am not sure which part makes it perfect but I left the island wondering when I could get back there to do basically nothing all over again.
IMG_0455